Results v Plan · season 79 · through day 15

Dodge

More starts off the plan than on it, and the ones on it were worth 7.5 points more apiece. Easiest points on the table: stop entering the rest.

7 races started
How it is going
110season points
0wins
33%on-plan scored1 of 3 races
25%off-plan scored1 of 4 races
Our advice

What we told them to enter

8 recommended races have run · 3 entered · 5 missed

Race dayRaceProj Told on dayOutcome
15Tavira - Faro 19 1not entered
11Taith o Bannau Brycheiniog 6 1not entered
8Lewis Pass - Greymouth 16 1not entered
7Picton - Murchison 15 1not entered
6The Tip Track 9 1not entered
8Royal Dartmoor Tour 20 1entered
5Hügel Fahrt 19 1entered
4Marathon 14 1entered
Races still to come are not listed — the plan page covers those. Advice only counts here if it could have been acted on: a race named after signup closed is not a miss, and nor is one that runs next season.
Bands

Was the plan right?

Entries the band…RacesScored Pts/racePoints
said to enter 3 1 of 3 (33%) 20.0 60
said to skip 4 1 of 4 (25%) 12.5 50
Tour stages sit outside the bands: signing up for the tour enters every stage in it, so a stage cannot be a good or a bad entry decision. They are listed for scale, and because they tend to out-earn single races per start.
Every race the squad started, split by whether its own measured entry band said to be there. If the top row pays better per start than the bottom one, the plan is worth following; if it does not, the bands need remeasuring.
Every race

Most recent first

DayRaceDivTypeProj FinishPtsVerdict
12 Trofeo de San Fermín 2 HL 30+ 65 – X off plan
10 Budapest ITT 2 TT 12 7 50 $ off plan
8 Royal Dartmoor Tour 2 HL 30+ 33 – X off plan
7 Trofeo Lago d´Iseo 3 HL 28 11 – X off plan
6 San Cipirello ITT 3 TT 1 4 60 $ on plan
5 Hügel Fahrt 2 HL 19 14 – X on plan
4 Marathon 2 24 32 – X on plan

$ on plan — entered on the band, took points X on plan — worth entering, drew a blank $ off plan — the band would have skipped it, it paid X off plan — greyed out: a start we did not need to make tour — signed once, every stage came with it

Proj is recomputed from the riders' stats as they are today, ranked against the field that actually turned up to that race. So it reads as “were these the right entries”, not as what the plan literally said on the day — a rider who has trained since projects better here than he did at signup. 30+ means he projected 31st or worse.

Back to the Dodge shed